Badger Residue Compressor Plant

Greenfield project consisting of: (3) CAT G3616 A4/KBU6-2 Gas Compressors with all associated piping and ancillary equipment, Equipment Foundations and Piers, Piping installation incluging station header, interconnect suction and discharge, field piping for utility, coolant, oil, etc.  Compressor Building Erection, (6) Storage tanks including concrete containment, and all construction/restoration site work.

WT-2 Power Generation

Install Four (4) CAT G3520 engine driven generator packages, consisting of approximately 10 MW; (1) generator building; (4) generator coolers; (4) generator exhaust mufflers;(1) assembly with one (1) 520 gallon coolant tank and (1) 520 gallon lube oil tank; (1) 1100 gallon open drain sump tank;(1) fuel gas regulation skid;(1) fuel gas RTU skid;(4) fuel gas heaters; All ancillary equipment and valves necessary for the complete installation of the compressor station.
Interconnect Piping Systems: Fuel gas piping; Fuel gas skid; Lube oil piping; Coolant piping; Drains; Sump tank.
Civil and Structural: Generator building foundations; Generator exhaust system foundations; Piping header supports; Cable tray supports; Transformer foundation

Mosaic II Compressor Station

Greenfield project consisting of: (3) Caterpillar 3608A4 / Ariel JGC-4 3-stage Natural Gas Reciprocating Compressor Packages, 72” ID x 40’ S-S Inlet Slug Catcher, 48” ID x 20’ S-S 3-Phase Separator, 110” ID x 30’ S-S NGL Storage Tank, 400 BBL Produced Water Tank, 400 BBL Slop Tank, 1,500 Gallon Sump Tank, MCC Building, 350 KW Natural Gas Generator, Fuel Conditioning Gas Skid, High-pressure Fuel Knockout Vessel, Vent Knock-out and Vent Stack Skid, Air Compressor Skid, 1,000 Gallon Chemical Tanks.

Scroll to Top